For 2026 concrete-frame reviews under ASCE 7-22 Chapter 16 NLRHA, 0.015h is the defensible default drift gate.
Approve 0.020h only when the exact clause, h basis, NLRHA demand, record-scaling sensitivity, and independent reviewer are documented.

How the 0.015h and 0.020h gates differ
ASCE AMPLIFY identifies Chapter 16 as Nonlinear Response History Analysis. In this guide, the NLRHA result is a demand—computed drift from the analysis—while 0.015h and 0.020h are candidate acceptance gates. A model run that satisfies its own internal checks therefore does not, by itself, select or justify either limit; the gate remains a separate acceptance decision.
The two gates are not interchangeable labels. Dividing 0.020h by 0.015h gives 1.333, so 0.020h is a 33% larger drift allowance. The absolute difference is 0.005h, and that gap is a real allowance, not rounding. Before any review meeting, convert 0.005h to the project’s displacement units for the governing story so the committee sees the actual margin.
| Item | Role | Value |
|---|---|---|
| NLRHA output | Demand | Computed drift |
| Default candidate gate | Acceptance limit | 0.015h |
| Exception candidate gate | Acceptance limit | 0.020h |
| Ratio of gates | Comparison | 1.333 (33% larger) |
| Gap between gates | Comparison | 0.005h |
The h basis is the common trap. h must be defined story by story; if one reviewer uses roof height and another uses story height, the same 0.020h multiplier produces different absolute displacement limits. The demand and the selected gate must therefore use one documented h for each story, and the comparison must be repeated if the h basis changes.
For 0.020h to be approved as an exception, document the exact ASCE 7-22 Chapter 16 clause relied on, the h basis for each story, the NLRHA demand being compared, the record-scaling sensitivity, and the independent reviewer. Until those items are in the review record, 0.015h remains the defensible default gate.

Three sources converge: verify, don't assume
Source 1 is the ASCE AMPLIFY page for ASCE-SEI 7-22 Chapter 16, which names the procedure as Nonlinear Response History Analysis. The supplied extract does not state a concrete-frame drift value, so the review action is to copy the exact clause and limit expression from the adopted standard into the project file and cite the edition, chapter, and section without paraphrasing the number. The file should show the printed expression and the reference used by the engineer of record.
Source 2 is the ASCE 41-23 General Updates page. It mentions ASCE 7 loading alignment and revised limitations on linear procedures. That makes it useful as a model and as an assessment cross-check for loading and procedure assumptions, but it is not a source for a concrete-frame drift limit under ASCE 7-22 Chapter 16 NLRHA. Use it to check whether the project's linear-procedure limitations and loading assumptions are aligned, not to import a drift number.
Source 3 is the Bioengineer.org summary of record-scaling dispersion. It states that standard earthquake record scaling causes large dispersion in modeled structural responses. That supports documenting the scaling method, record set, and response dispersion, but it does not establish or replace a concrete-frame drift number. Treat it as a sensitivity warning, not as a code limit.
Taken together, the three available sources converge on a verification rule rather than a numeric answer: none of them fixes a concrete-frame drift number, so any 0.015h or 0.020h figure used in review must be traced to the adopted ASCE 7-22 Chapter 16 clause text itself. The sources can guide scope, terminology, and sensitivity checks, but they do not supply the acceptance number.
If a proposed limit cannot be traced to the copied clause and the project-specific demand calculation, mark it as undocumented rather than inferred from these sources. This keeps the review focused on evidence in the project file and prevents a summary or update page from being mistaken for a drift limit.

015h vs 0.020h: winner and 0.005h cost
| Gap check | h = 4.0 m | h = 10 ft |
|---|---|---|
| 0.005h allowance | 20 mm | 0.6 in |
The 0.005h gap equals 20 mm at h = 4.0 m and 0.6 in at h = 10 ft, so it is added drift capacity, not rounding. As priced above, 0.015h remains the gate whenever the exception file is incomplete; accepting the extra allowance without documentation turns a code-review decision into an undocumented design credit.
The record-scaling item is not decorative. The supplied source “Standard Earthquake Record Scaling Causes Large Dispersion in Modeled Structural Responses” supports a simple check: show whether the selected scaling approach moves the NLRHA demand ratios enough to matter at the two gates. For a 0.020h exception, I do not accept a single favorable run as the whole answer; the file needs the sensitivity check attached to the same clause path and h basis used for approval.
My review rule is therefore binary. If the exception package is complete, 0.020h can be recorded as the approved gate for that project, with the clause path and sign-off visible to the next reviewer. If the package is incomplete, 0.015h is the gate, the 0.005h allowance is not spent, and the design team gets a clear path: fix the documentation or redesign to the default rather than argue the gap away.

What the available sources cannot settle
The edge-case table below lists when the 0.015h default breaks or still wins. Use it as a documentation screen before accepting any exception, and treat every row as requiring project-specific evidence from the adopted code and analysis record.
| Edge case | 0.015h default | Required documentation before any exception |
|---|---|---|
| Written project clause allows 0.020h | Breaks only conditionally | Exact ASCE 7-22 clause text, h basis, NLRHA demand, record-scaling sensitivity, and independent reviewer sign-off. Forum posts and PDF summaries do not count as clause text. |
| Linear procedure governs the check | Does not break; NLRHA exception not applicable | Confirm the governing analysis procedure and its acceptance criteria in the adopted standard. The ASCE 41-23 General Updates page notes revised limitations on linear procedures, so an NLRHA drift exception should not be carried across procedures. |
| High record-scaling dispersion | Still wins | Record-scaling sensitivity, dispersion across scaled records, and clause-based justification showing why the higher gate remains defensible. |
A written project clause is the only condition in which the 0.015h default can break. Even then, the exception is incomplete until the record attaches the exact ASCE 7-22 clause text, the h basis, the NLRHA demand, the record-scaling sensitivity, and an independent reviewer sign-off. If any of those items is missing, the package supports the default gate, not the exception.
A linear procedure changes the review frame instead of widening the drift allowance. Because procedure limits are standard-specific, the reviewer should confirm that the governing analysis procedure actually permits the nonlinear acceptance check being proposed. If the project check is not governed by an ASCE 7-22 Chapter 16 NLRHA demand, a 0.020h NLRHA exception should not be carried into that check.
High record-scaling dispersion pushes the decision toward the default. Bioengineer.org reports that standard earthquake record scaling can cause large dispersion in modeled structural responses, which means a computed demand can shift with record selection or scaling choices. Before any 0.020h exception is considered, the record should show how sensitive the NLRHA demand is to scaling and why that sensitivity does not undermine the clause-based approval.

Worked gate: h = 3.0 m, D = 0.018h
Work the gate arithmetic on an illustrative example before applying it to a project. Take story height h = 3.0 m: the lower gate is 0.015h = 45 mm and the upper gate is 0.020h = 60 mm. An illustrative NLRHA demand of D = 0.018h = 54 mm tests the arithmetic and the documentation habit; substitute the project's own h and D once the clause citation exists.
Two checkpoints decide the case. First, D against the lower gate: 54/45 = 1.20, so the demand exceeds 0.015h by 20 percent and fails the default gate. Second, D against the upper gate: 54/60 = 0.90, so the demand sits at 90 percent of 0.020h and would pass if the exception were granted. The excess over the lower gate is 54 − 45 = 9 mm, which is 9/3000 = 0.003h. That is half of the 0.005h gap, so the decision cannot be waved off as rounding; it is a real allowance being consumed, and the file must say so.
The artifact row is what makes the exception auditable. Every cell must carry content — clause text, h basis, demand, both ratios, and a named reviewer — before anyone advances to 0.020h, as the worked row below shows:
| Clause cited | h basis | NLRHA D | Ratio at 0.015h | Ratio at 0.020h | Reviewer |
|---|---|---|---|---|---|
| ASCE 7-22 Ch. 16 clause, copied verbatim | 3.0 m, state deflection vs. drift basis | 54 mm (0.018h) | 1.20 — fails | 0.90 — passes | Independent, named |
Two cells deserve extra care. The h basis cell must state whether h is the story height used in the NLRHA model or the height used in the gate arithmetic—if they differ, the ratios are not comparable. And the NLRHA D cell should carry a scaling-sensitivity note: the Bioengineer.org report on standard earthquake record scaling documents large dispersion in modeled structural responses, so a single record set producing 54 mm is weaker evidence than a demand that survives re-scaling. If the demand moves materially under scaling, the 0.90 pass at 0.020h is fragile.
The reviewer cell is the enforcement mechanism. An independent reviewer signs only when the clause is verbatim, the h basis is stated, the demand is the NLRHA output (not an internal model check), and the scaling sensitivity is recorded. Until all six cells carry content, the illustrative result stands as computed: 1.20 against 0.015h, fail; 0.90 against 0.020h, pass only with the documented exception. The 9 mm excess is the number the reviewer argues about—make them argue with the row in front of them.

If/then rules for the drift gate
For 2026 concrete-frame reviews, apply these if/then rules in order; do not skip a branch because the final drift value looks close to a gate. If no written clause path for 0.020h exists, set the gate at 0.015h. If a clause is cited but D/0.015h is 1.0 or less, keep 0.015h anyway; a citation does not turn a passing demand into an exception.
The 0.020h branch opens only when D/0.015h exceeds 1.0 and D/0.020h is 1.0 or less. Before using 0.020h, the review file must contain the exact clause citation, an independent reviewer, and a record-scaling sensitivity. If any one of those three items is missing, stay at 0.015h. This keeps 0.020h as an exception that must be earned, not a second default.
Stop before choosing either gate if the work relies on a linear procedure or shows unbounded record-scaling dispersion. ASCE 41-23 notes revised limitations on linear procedures, and record-scaling dispersion can dominate modeled structural response. In either case, rerun the NLRHA before selecting a gate. If the h basis is undocumented, reject the 0.020h exception rather than infer it from the model or the drift value.
Apply the ratios to the governing NLRHA demand, not to an average of record results, and keep the evidence with the calculation. A missing independent reviewer, an undocumented h basis, or an unbounded scaling dispersion is not cured by a larger safety factor or by re-labeling the demand.
The decision record should name the branch used, the evidence checked, and the reviewer. A compact if/then table can carry the same logic into the review checklist.
| Condition | Required action |
|---|---|
| No written clause path for 0.020h | Set gate at 0.015h |
| Clause cited and D/0.015h ≤ 1.0 | Keep 0.015h |
| D/0.015h > 1.0 and D/0.020h ≤ 1.0 | Require clause citation, independent reviewer, and record-scaling sensitivity; otherwise stay at 0.015h |
| Linear procedure or unbounded record-scaling dispersion | Stop and rerun NLRHA before either gate |
| Undocumented h basis | Reject the 0.020h exception |
Frequently Asked Questions
When can a reviewer approve the 0.020h drift gate instead of the default?
Approve 0.020h only when the exact clause, h basis, NLRHA demand, record-scaling sensitivity, and independent reviewer are documented.
Does a model run that passes its internal checks automatically justify either drift gate?
A model run that satisfies its own internal checks does not, by itself, select or justify either limit, because the gate remains a separate acceptance decision.
What is the ratio of the 0.020h gate to the 0.015h gate?
Dividing 0.020h by 0.015h gives 1.333.
Is the 0.005h difference between the two gates merely rounding?
The absolute difference is 0.005h, and that gap is a real allowance, not rounding.
What should be done with the 0.005h gap before a review meeting?
Before any review meeting, convert 0.005h to the project’s displacement units for the governing story so the committee sees the actual margin.
What is the common trap in defining h for these drift gates?
h must be defined story by story, and mismatched roof-height versus story-height definitions are the common trap.
Quick answers
| For 2026 concrete-frame reviews under ASCE 7-22 Chapter 16 NLRHA, which drift gate is described as the defensible default? | For 2026 concrete-frame reviews under ASCE 7-22 Chapter 16 NLRHA, 0.015h is the defensible default drift gate. |
| When may 0.020h be approved according to the article? | Approve 0.020h only when the exact clause, h basis, NLRHA demand, record-scaling sensitivity, and independent reviewer are documented. |
| How does the article characterize the NLRHA result versus 0.015h and 0.020h? | In this guide, the NLRHA result is a demand—computed drift from the analysis—while 0.015h and 0.020h are candidate acceptance gates. |
| What does the article say about the ratio and gap between the two gates? | Dividing 0.020h by 0.015h gives 1.333, so 0.020h is a 33% larger drift allowance, and the absolute difference is 0.005h, and that gap is a real allowance, not rounding. |
| What should be done before any review meeting regarding the gap between the gates? | Before any review meeting, convert 0.005h to the project’s displacement units for the governing story so the committee sees the actual margin. |
Also worth reading: 020hsx vs 0.035hsx: ASCE 7-22 and ASCE 41-22 Drift Limits: 020hsx vs 0.035hsx: ASCE 7-22 · Concrete wall drift: American Society of Civil Engineers (ASCE) 7-22—0.005h, Model?: Concrete wall drift: American Society · High early strength bridge concrete: 3,000 psi at 3 days, set gates before pricing: High early strength bridge concrete: